A boutique-hotel walk-in shower at blue hour with a stone base and teal surround

The bath package.

Five components, counted sheet by sheet, by unit type and location. Sizes, specs and finish references on every line.

PL

Shower & tub bases

Every base on every sheet, tied to the unit type and the room it sits in.

A stone soaking tub beside a frameless glass shower in a teal-tiled bathroom at dusk
  • Shower basesSize, drain side and position, threshold or curbless
  • Tub bases and alcove tubsSize, drain side, apron and alcove type
  • Accessible and transfer basesCalled out on their own lines, by unit
  • LocationUnit type, floor and sheet for every count
SU

Surrounds

Wall kits counted as sets, matched to the base they sit on.

A corner of travertine and teal tile with copper trim in raking light
  • Shower wall kitsPanel count, height and finish
  • Tub surroundsPanel count, height and finish
  • Niches and shelvesWhere the drawings or specs show them
  • Trim and cornersWhen the spec lists them
GL

Shower glass

Doors, panels and returns, read off plans and enlarged bath details together.

A frameless glass shower door edge with a copper hinge against teal tile
  • Hinged and pivot doorsWidth, height and glass thickness
  • Fixed panels and returnsSizes, with or without header
  • Sliding and bypass doorsWidth and track finish
  • Hardware finishAs specified, per unit type
DR

Barn doors

Slabs and tracks counted together, so nothing ships without its hardware.

A walnut barn door on a black steel track at the entrance to a bathroom
  • Door slabsWidth by height, species or finish
  • Track and hardwareTrack length, soft-close, finish
  • LocationsBath entries and other openings in scope, by unit
AC

Accessories

The small parts that add up fastest, with accessible units broken out.

A copper grab bar, robe hook and towel ring on travertine against teal plaster
  • Grab barsLength, finish, accessible units called out
  • Towel bars, rings and hooksSize and finish
  • Shower rodsCurved or straight, length
  • Seats and shelvesFold-down seats, soap and shampoo shelves

What lands in your inbox.

  • An organized ExcelCounts by unit type and location, with sizes, specs and finish references. Built on your template, our standard sheet or a supplier sheet.
  • Marked-up PDF plansEvery counted fixture tagged on the sheet, with codes that match the Excel rows.
  • A scope noteWhat was in scope, which sheets were used, and anything on the drawings that needs an answer from the design team.

See the formats

A floor plan marked with copper tags beside a printed spreadsheet on a walnut desk at dusk

When drawings change.

Send the addendum or the revised sheets. We re-count the changed sheets, cloud the changes on the PDF and add a change column to the Excel, so you can see what moved.

If the change comes from our error, the re-count is free. Otherwise it is billed as a revision: $75 plus a charge per changed sheet, quoted before we start.

We take drawings as PDF, CAD or BIM.

Send a drawing set.

Your first 10 sheets are free. The count comes back in 3 business days, in your format.

Send drawings